USA MedicalEquipment Shipping
← All guides

Checklist · 4-page PDF

Medical Equipment Moving Checklist

A step-by-step pre-move, in-transit, and delivery checklist

1. Pre-Move Planning & Site Survey

Complete these steps at least two to four weeks before the move date to avoid delays.

  • Confirm make, model, weight, and crated dimensions of every unit.
  • Obtain the OEM de-installation and handling requirements for each device.
  • Perform an origin and destination site survey: door widths, hallway turns, elevator capacity, and floor load ratings.
  • Identify power-down, helium/cryogen, and calibration requirements for MRI and CT systems.
  • Verify certificate of insurance limits match the replacement value of the equipment.
  • Schedule any required OEM or biomed engineer for de-install and re-install.
  • Confirm loading dock access, liftgate needs, and parking permits at both ends.

2. De-Installation & Packing

  • Back up all software, patient data, and system configurations before power-down.
  • Follow OEM shutdown sequence; document cable positions with photos.
  • Remove and separately pack detachable components, coils, and detectors.
  • Use anti-static and moisture protection for sensitive electronics.
  • Build custom crates with foam-in-place or cradle bracing for each unit.
  • Label every crate with orientation arrows, weight, and handling instructions.

3. Rigging, Loading & Transport

  • Use rated rigging equipment and trained crews for units over 500 lbs.
  • Load onto air-ride, climate-controlled trailers to limit shock and vibration.
  • Secure all crates with rated straps and blocking to prevent shifting.
  • Apply shock and tilt indicators to high-value imaging equipment.
  • Maintain chain-of-custody documentation and real-time GPS tracking.
  • Confirm route clearances for oversized or overweight loads.

4. Delivery, Installation & Sign-Off

  • Inspect shock/tilt indicators and crates for damage before unloading.
  • Move units to final location using floor and doorway protection.
  • Uncrate, position, and level equipment per OEM specification.
  • Coordinate OEM/biomed re-installation, calibration, and QA testing.
  • Document delivery condition with photos and obtain signed proof of delivery.
  • Dispose of or return crating materials per facility policy.

Let our specialists handle it

As an asset-based carrier, we manage every step above with our own trained crews and equipment. Request a free quote today.

Call NowFree Quote